Open on EUR-Lex ↗
◷
New version applies from 07/01/2014 — introduced by Directive 2010/75/EU. 64 provisions change. Article 12 is deleted from 07/01/2014.

Article 12 - Access to information and public participation

Article 12
Access to information and public participation

1.Without prejudice to Council Directive 90/313/EEC ( 24 ) and Directive 96/61/EC, applications for new permits for incineration and co-incineration plants shall be made available at one or more locations accessible to the public, such as local authority offices, for an appropriate period to enable it to comment on them before the competent authority reaches a decision. That decision, including at least a copy of the permit, and any subsequent updates, shall also be made available to the public.

2.For incineration or co-incineration plants with a nominal capacity of two tonnes or more per hour and notwithstanding Article 15(2) of Directive 96/61/EC, an annual report to be provided by the operator to the competent authority on the functioning and monitoring of the plant shall be made available to the public. This report shall, as a minimum requirement, give an account of the running of the process and the emissions into air and water compared with the emission standards in this Directive. A list of incineration or co-incineration plants with a nominal capacity of less than two tonnes per hour shall be drawn up by the competent authority and shall be made available to the public.

Official text · consolidated version 11/12/2008 (no longer in force) Open full page ↗
11 queries · page built in 92 msInventory f82bbfa3