(12)Council Directive 96/61/EC 7 sets out an integrated approach to pollution prevention and control in which all the aspects of an installations environmental performance are considered in an integrated manner. Installations for the incineration of municipal waste with a capacity exceeding 3 tonnes per hour and installations for the disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day are included within the scope of the said Directive.
◷
New version applies from 07/01/2014 — introduced by Directive 2010/75/EU.
64 provisions change.
Recital 12 is deleted from 07/01/2014.
Recital 12
- 7 OJ L 257, 10.10.1996, p. 26. ↩