Open on EUR-Lex ↗

Annex V - DECLARATION OF VERIFICATION OF SUBSYSTEMS

Annex V
DECLARATION OF VERIFICATION OF SUBSYSTEMS

DECLARATION OF VERIFICATION OF SUBSYSTEMS

1. ‘EC’ declaration of verification of subsystems

The ‘EC’ declaration of verification and the accompanying documents must be dated and signed.

The said declaration must be based on the information resulting from the ‘EC’ verification procedure for subsystems as defined in Section 2 of Annex VI. It must be written in the same language as the technical file and must contain at least the following:

— the Directive references,

— name and address of the contracting entity or the manufacturer, or its authorised representative established within the European Union (specify the trade name and full address; in the case of the authorised representative, specify also the trade name of the contracting entity or the manufacturer),

— a brief description of the subsystem,

— name and address of the notified body which conducted the ‘EC’ verification referred to in Article 18,

— the references of the documents contained in the technical file,

— all the relevant temporary or final provisions to be complied with by the subsystems and in particular, where appropriate, any operating restrictions or conditions,

— if temporary: duration of validity of the ‘EC’ declaration,

— identity of the signatory.

Where reference is made in Annex VI to the ‘EC’ ISV declaration, the provisions of this Section shall apply to this declaration.

2. Declaration of verification of subsystems in the case of national rules

Where reference is made in Annex VI to the declaration of verification of subsystems in the case of national rules, the provisions of Section 1 shall apply mutatis mutandi to that declaration.

Official text · consolidated version 22/03/2011 (no longer in force) Open full page ↗
11 queries · page built in 25 msInventory f82bbfa3