Recital 36

Comparing 04/12/2012 → 01/07/2013: 0 added, 0 removed, 1 changed Close comparison

It may be appropriate for nuclear power installations, or electricity generation installations that are intended to make use of geological storage permitted under Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide ( 13 ) ,), to be located in places where the recovery of waste heat through high-efficiency cogeneration or by supplying a district heating or cooling network is not cost-effective. Member States should therefore be able to exempt those installations from the obligation to carry out a cost-benefit analysis for providing the installation with equipment allowing the recovery of waste heat by means of a high-efficiency cogeneration unit. It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.

Official text · the act as publishedFrom the act as published (consolidated texts do not carry recitals or the preamble). Open full page ↗
13 queries · page built in 37 msInventory f82bbfa3