(36)It may be appropriate for nuclear power installations, or electricity generation installations that are intended to make use of geological storage permitted under Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide 13 , to be located in places where the recovery of waste heat through high-efficiency cogeneration or by supplying a district heating or cooling network is not cost-effective. Member States should therefore be able to exempt those installations from the obligation to carry out a cost-benefit analysis for providing the installation with equipment allowing the recovery of waste heat by means of a high-efficiency cogeneration unit. It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.
◷
New version applies from 01/07/2013.
108 provisions change.
Later versions: 09/07/2018, 24/12/2018, 12/06/2019, 01/01/2020, 26/10/2020, 01/01/2021, 04/05/2023.
Recital 36 changes in this version: compare with the current text.
Recital 36
- 13 OJ L 140, 5.6.2009, p. 114 . ↩