Open on EUR-Lex ↗

Recital 18

Recital 18

(18)The procedure to be followed in the case of essential requirements applicable to a subsystem which have not yet been covered by detailed specifications in the corresponding TSI should be specified. In such case, the bodies responsible for the conformity assessment and verification procedures should be the notified bodies referred to in Article 20 of Directives 96/48/EC and 2001/16/EC.

Official text · the act as publishedFrom the act as published (consolidated texts do not carry recitals or the preamble). Open full page ↗
7 queries · page built in 4 msInventory f82bbfa3