Annex X

Annex X

ANNEX X

Guarantee of origin for electricity produced from high-efficiency cogeneration

(a)

Member States shall take measures to ensure that:

the guarantee of origin of the electricity produced from high-efficiency cogeneration:

enable producers to demonstrate that the electricity they sell is produced from high-efficiency cogeneration and is issued to this effect in response to a request from the producer,

is accurate, reliable and fraud-resistant,

is issued, transferred and cancelled electronically;

the same unit of energy from high-efficiency cogeneration is taken into account only once.

(b)

The guarantee of origin referred to in Article 14(10) shall contain at least the following information: The guarantee of origin shall be of the standard size of 1 MWh. It shall relate to the net electricity output measured at the station boundary and exported to the grid.

the identity, location, type and capacity (thermal and electrical) of the installation where the energy was produced;

the dates and places of production;

the lower calorific value of the fuel source from which the electricity was produced;

the quantity and the use of the heat generated together with the electricity;

the quantity of electricity from high-efficiency cogeneration in accordance with Annex II that the guarantee represents;

the primary energy savings calculated in accordance with Annex II based on the harmonised efficiency reference values indicated in point (f) of Annex II;

the nominal electric and thermal efficiency of the plant;

whether and to what extent the installation has benefited from investment support;

whether and to what extent the unit of energy has benefited in any other way from a national support scheme, and the type of support scheme;

the date on which the installation became operational; and

the date and country of issue and a unique identification number.