‘R0411/C0020 | Initial absolute values before shock — Assets — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the initial absolute value of the assets sensitive to the spread risk on bonds and loans that are qualifying infrastructure investments. Recoverables from reinsurance and SPVs shall not be included in this cell. |
R0411/C0030 | Initial absolute values before shock — Liabilities — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the initial absolute value of the liabilities sensitive to the spread risk on bonds and loans that are qualifying infrastructure investments. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0411/C0040 | Absolute values after shock — Assets — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the absolute value of the assets sensitive to the spread risk on bonds and loans that are qualifying infrastructure investments, after the shock. Recoverables from reinsurance and SPVs shall not be included in this cell. |
R0411/C0050 | Absolute values after shock — Liabilities (after the loss absorbing capacity of technical provisions) — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the absolute value of the liabilities sensitive to the spread risk on bonds and loans that are qualifying infrastructure investments, after the shock and after the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0411/C0060 | Absolute value after shock — Net solvency capital requirement — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the net capital charge for spread risk on bonds and loans that are qualifying infrastructure investments, after adjustment for the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. If R0010/C0010 = 1, this item shall not be reported. |
R0411/C0070 | Absolute values after shock — Liabilities (before the loss absorbing capacity of technical provisions) — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the absolute value of the liabilities sensitive to the spread risk on bonds and loans that are qualifying infrastructure investments, after the shock but before the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0411/C0080 | Absolute value after shock — Gross solvency capital requirement — Spread risk — bonds and loans (qualifying infrastructure investments) | This is the gross capital charge for spread risk on bonds and loans that are qualifying infrastructure investments, i.e. before the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. If R0010/C0010 = 1, this item shall not be reported. |
R0412/C0020 | Initial absolute values before shock — Assets — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the initial absolute value of the assets sensitive to the spread risk on bonds and loans other than qualifying infrastructure investments. Recoverables from reinsurance and SPVs shall not be included in this cell. |
R0412/C0030 | Initial absolute values before shock — Liabilities — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the initial absolute value of the liabilities sensitive to the spread risk on bonds and loans other than qualifying infrastructure investments. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0412/C0040 | Absolute values after shock — Assets — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the absolute value of the assets sensitive to the spread risk on bonds and loans other than qualifying infrastructure investments, after the shock. Recoverables from reinsurance and SPVs shall not be included in this cell. |
R0412/C0050 | Absolute values after shock — Liabilities (after the loss absorbing capacity of technical provisions) — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the absolute value of the liabilities sensitive to the spread risk on bonds and loans other than qualifying infrastructure investments, after the shock and after the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0412/C0060 | Absolute value after shock — Net solvency capital requirement — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the net capital charge for spread risk on bonds and loans other than qualifying infrastructure investments, after adjustment for the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. If R0010/C0010 = 1, this item shall not be reported. |
R0412/C0070 | Absolute values after shock — Liabilities (before the loss absorbing capacity of technical provisions) — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the absolute value of the liabilities sensitive to the spread risk on bonds and loans other than qualifying infrastructure investments, after the shock but before the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. The amount of TP shall be net of reinsurance and SPV recoverables. |
R0412/C0080 | Absolute value after shock — Gross solvency capital requirement — Spread risk — bonds and loans (other than qualifying infrastructure investments) | This is the gross capital charge for spread risk on bonds and loans other than qualifying infrastructure investments, i.e. before the loss absorbing capacity of technical provisions. This value shall be reported only where the split between R0411 and R0412 could be derived from the method used for the calculation. When the split is not possible only R0410 shall be filled in. If R0010/C0010 = 1, this item shall not be reported.’ |