Open on EUR-Lex ↗

Article 44 - Submission for approval of the final draft of the prospectus

Article 44
Submission for approval of the final draft of the prospectus

1.The final draft of the prospectus shall be submitted for approval together with all the information referred to in Article 42(2) that has changed compared to the previous submission, with the exception of the information referred to in points (a) and (h) of that Article. The final draft of the prospectus shall not be annotated in the margin.

2.Where no changes have been made to the information referred to in Article 42(2), the issuer, offeror or person asking for admission to trading on a regulated market shall confirm so in writing and by electronic means.

Official text · consolidated version 18/06/2026 (in force) Open full page ↗
5 queries · page built in 6 msInventory f82bbfa3