ANNEX I-E
ISOTOPE ENRICHMENT INSTALLATIONS
Administrative details:
(a) | date (date on which the BTC was completed); |
(b) | version (unique number for reference); |
(c) | responsible officer (name and contact details). |
IDENTIFICATION OF THE INSTALLATION
1. | Name of the installation (indicate usual abbreviation, if applicable) Indicate MBA code(s) (once attributed). |
2. | Location, postal and e-mail address (functional mailbox when available) and telephone number. |
3. | Owner (legally responsible body or individual) with contact details. |
4. | Operator (legally responsible body or individual) with contact details. |
5. | Description (main features only). |
6. | Purpose and type of the installation. |
7. | Present status (e.g. design phase, under construction, in operation, closed down and/or under decommissioning). |
8. | Pre-operation information Design and construction schedule dates, estimated commissioning and operation starting dates. Requested and/or approved licence dates (e.g. decision of principle, construction and expected operation licence request dates). Information on expected date of receipts of the nuclear material and/or fuel assemblies. Installation design drawings to be communicated as soon as these are available. |
9. | Normal operating mode (shift system adopted, approximate dates of operating periods in year. |
10. | Area layout (map showing the installation, boundaries, buildings, roads, rivers, railways, etc.). |
11. | Layout of installation: structural containment, fences and access routes; containment of certain parts of the installation; routes followed by nuclear material; nuclear material storage areas; each main processing area and process laboratory; test or experimental areas; waste storage area; analytical laboratory. |
12. | Safeguards responsible, also for nuclear material accountancy, with e-mail address (functional mailbox when available) and telephone number. |
Overall process parameters
13. | Description of the installation (indicating main items of equipment). |
14. | Process description (identifying sampling and key measurement points, MBAs, inventory locations). |
15. | Design capacity (throughput and energy consumption). |
16. | Anticipated throughput (in the form of a forward programme indicating proportion of various feeds and products). |
17. | Other important items of equipment using, producing or processing nuclear material (such as testing and experimental equipment). |
GENERAL ARRANGEMENTS AT THE INSTALLATION, INCLUDING THOSE RELATING TO MATERIAL USE AND ACCOUNTANCY, CONTAINMENT AND SURVEILLANCE
Description of nuclear material
18. | Main material description (feed, product, tails): chemical and physical form; throughput and enrichment ranges (for normal flowsheet operation indicating if blending and/or recycling takes place); batch size/flow rate and campaign period; maximum capability as concentration of top product (nat. U feed); storage inventory; frequency of receipt or shipment. |
19. | Waste material: source and form (indicating major contributors; liquid or solid; range of constituents; enrichment range; include contaminated equipment); storage inventory range, method and frequency of recovery/discharge. |
20. | Container and storage area descriptions. |
21. | Discards to the environment, conditioned waste and retained waste as % of input. |
22. | In-process inventory (within plant and equipment during normal operation; indicate quantity, form and main location and any significant change with time or throughput). |
Maintenance of the installation
23. | Maintenance, decontamination, clean-out: normal maintenance of the installation; installation and equipment decontamination and subsequent nuclear material recovery; installation and equipment clean-out including means of ensuring vessels are empty. |
Protection and safety rules
24. | Specific rules for the physical access to the nuclear material for inspector information. |
25. | Specific radiological protection and health and safety rules for inspector compliance (if extensive, attach separately). |
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL (NMAC)
26. | Description of the NMAC system, the method of recording and reporting accountancy data and establishing material balances, frequency of physical inventory takings, procedures for account adjustment after plant inventory, mistakes, etc., under the following headings: General Source data (e.g. shipping and receiving forms, internal transfer documents, physical inventory forms, the initial recording of measurements and measurement control sheets). Procedures for making adjustments and corrections (indicating how the adjustments are authorized and substantiated); Receipts (including method of dealing with shipper/receiver differences and subsequent accounting corrections; checks and measurements used to confirm nuclear material content); Shipments (products, waste); Transfers to retained waste (method of establishing quantities, method and envisaged period of storage, possible subsequent uses of retained waste); Discards to the environment (method of establishing quantities, method of discharge); Other inventory changes, e.g. transfers to conditioned waste, unmeasured losses (method of establishing quantities); Physical inventory Description of procedures, scheduled frequency, estimated distribution of nuclear material, methods of operator’s inventory taking (both for the number of items as well as their nuclear material weights, including relevant assay method), accessibility and possible verification method for nuclear material, expected accuracy, and access to nuclear material. In particular the description of procedures shall also provide the basic inventory approach to be used, i.e. planning, organizing, and conducting the inventory taking, primary responsibility for the inventory, process clean-out, accountancy of process residual hold-up; Operational and accounting records (including internal transfer forms, method of adjustment or correction, control measures and responsibility for records). Description of how these records are maintained, including when an adjustment or correction is needed, place where the records can be consulted, retention time and language; Particular accounting provisions Description of particular provisions, e.g. for the designation of batch IDs and methods for preventing, detecting and timely fixing of accounting discrepancies. |
27. | Features related to containment and surveillance measures (general description of applied or possible measures in reference to floor plan or plant layout). |
28. | For each key measurement point provide the following information, when applicable: description of location, type, identification; expected types of inventory change at this measurement point and possibility to use this measurement point for physical inventory taking; chemical and physical form of material; sampling procedure and equipment used; measurement/analytical method and equipment used; source and level of random and systematic errors (weighing, volume, sampling, analytical); calculative and error propagation technique; technique and frequency of calibration of equipment used; programme for the continuing appraisal of the accuracy of weight, volume, sampling techniques and measurement methods; programme for statistical evaluation of data from (h) and (i). |
29. | Overall limit of error. Describe procedures to combine individual measurement error determination to obtain the overall limit of error for: shipper/receiver differences; book inventory; physical inventory; material unaccounted for (MUF). |
POST-OPERATION INFORMATION
30. | Decommissioning schedule dates (End of operation and of decommissioning dates). |
31. | Decommissioning plan, which shall include the following: key events of the decommissioning plan; removal and recovery of nuclear material. Provide a plan containing estimates of how, where and when nuclear material shall be recovered and/or removed (e.g. loose material consolidated into items, removal of items, recovery/removal of material from decontamination activities, and recovery/removal of nuclear material in waste) and how it shall be accounted for; removing or rendering inoperable of equipment essential for the functioning of the installation, for handling or storing nuclear material. |
OTHER INFORMATION RELEVANT FOR THE APPLICATION OF SAFEGUARDS
32. | Other optional information that the operator considers relevant to safeguarding the installation. |